Question | Answer | % Correct |
---|---|---|
(The) ________ reviews plans and specifications for new construction projects before construction begins. | TCEQ | 100%
|
To implement state policy, (the) ________ has set minimum surface water quality standards for the waters of the state. | TCEQ | 100%
|
A role of supervision and management is to set job assignments and secure permits and finances to do the job. | True | 100%
|
Enforcement actions can be taken if the pollution or waste violates the Texas Water Code. Such violations may include which of the following? | All of the above | 91%
|
The local government may inspect and investigate water quality conditions within its jurisdiction to determine which of the following? | All of the above | 91%
|
The ________ gives the basic structure for regulating discharges of pollutants into the waters of the United States. | Clean Water Act | 91%
|
If an accidental discharge, bypass, or spill occurs, the discharger must notify (the) ________ as soon as possible and within 24 hours by telephone or fax. | TCEQ | 91%
|
_________ gives the TCEQ jurisdiction over discharges of waste into or adjacent to water in the state. | Texas Water Code | 91%
|
Every city with more than ________ in population needs to establish a water pollution control program and hire qualified personnel to administer it. | 10,000 | 82%
|
Newly hired workers will have ________ to obtain their license. | 1 year | 82%
|
Administrative penalties, up to ________ per day for each violation, may be assessed against any violator. | $25,000 | 82%
|
Major surface waters are classified as ________ for the purposes of water quality management and designation of site-specific standards. | segments | 82%
|
State law requires that reports are to be submitted no later than the ________ day of the following month. | 20th | 73%
|
Responsibilities of the licensed operator include protecting the public from waterborne disease, performing duties professionally, protecting state water from pollution, maintaining required licensing, practicing safety, and controlling inflation. | False | 73%
|
Water quality fees may be as high as ________ per permit. | $115,000 | 64%
|
Copyright H Brothers Inc, 2008–2024
Contact Us | Go To Top | View Desktop Site